The Assign feature allows you to update the Location, System, and Head End for multiple Products at one time. You can also re-assign items on pending Change Orders to another pending Change Order.
Select the Products you wish to update and then click the [Assign] button. Here you can choose from: Location and System, Location, System, or Head End. Depending on what you choose, a different interface will open. Below is the Location and System form:
The Location and System form should be used only if every Product selected is being assigned to the same Location and System. If, for example, you had multiple Products selected that you wish to assign to a Location, but all are in different Systems, you would just choose the Location option from the list vs. Location and System.
Click [Assign] when done selecting.
This option will allow you to re-assign items from a pending Change Order to another pending Change Order:
You can also assign/reassign items already added to a Project to a Locations/System via the Drop Zone. First select the Location and/or System in the Drop Zone and then drag and drop the items from the grid of the Project Editor to the Assign section of the Drop Zone: