New Project Wizard

SI 2017 Page Logo.jpg

Details

 

The only two required fields to be able to save a Project are the Client and Project Name, however, you will likely want to add more information than that.

 

All of the fields below can be later added/edited for a Project via the Project Information interface or via the Settings tab within a Project.

Steps

 

Open the Project Explorer:

 

manage proj start.png

 

Click New->Project:

 

new project button.png

 

This will open the New Project Wizard:

Step 1

 

npw 1.png

 

Client

Here you can select an existing client from the list or you can click the [Create Client] button to create a New Client from scratch, import from Outlook, or import from QuickBooks. If you type in a new Client name, you will be prompted to create a Client. This is a required field.

Client Number

This field can be filled in if you want to add a client number, e.g. - an identifier for the client from your accounting software.

Project Name

The Project name will print on most reports in SI 2017. This is a required field.

Project Number

This will auto-populate once the Project has been saved based on your Project Number Format settings. You can also manually type any number you wish in this field.

Progress

Set a Progress if desired. See Progresses.

Product Price Type

This defaults to Price Type "A", or to whatever you have renamed this to under Product Price Types. Change if desired.

Assigned To

The user you are logged in as will automatically populate this field. This field is used to limit access to a Project based on other User's Permissions.

Start/End Date

Enter the Start Date if you know it at this point in time.

Step 2

 

npw 2.png

 

 

If a Primary Contact is associated with the Client, their information will be pre-filled in here. Enter any additional Contacts to the Project, e.g. Spouse, Contractor, Builder, Architect, etc.. Use the [+] button to add a New or Existing Contact, or you can import from Outlook. This list can be printed via the Project Contact Information report.

Step 3

 

Enter/edit the Site Address and Billing Address (if needed). The Site Address is used on reporting.

 

npw 3.png

 

You can use the [Copy Billing Address] button or the [Change Address] button to select any other address you have associated with the Client.

Step 4

 

Choose your Taxes for the Project. See Tax Settings.

 

npw 4.png

 

Step 5

 

Assign any Resources to the Project. See Users/Resources.

 

npw 5.png

 

Your User/Resource information will automatically be populated and you can use the [Assign] button to add additional Resources. Resources are not required and can be added later, say when creating a Schedule for installation.

Step 6

 

Enter a scope of work for the Project if needed. You can manually type in this field, paste text into this field, or use Snippets that you have created, see Snippets. All text entered into this field will be unformatted as this is a database field. If you wish to have a Rich Text Format (RTF) formatted Scope of Work, you will need to do this from within the Project once the Project has been saved. See Scope of Work. This can printed via the Scope of Work Document report.

 

npw 6.png

Step 7

 

 

 

 

npw 7.png

Step 8

 

Enter any Systems for the Project. You can add Systems via the [Add] button if you want to choose from the list of Systems from your Control Panel or you can click the [New] button if you want to manually type the names.


npw 8.png

Step 9

 

Here you can modify the contract percentages. See Payment Terms.

 

npw 9.png

Step 10

 

If needed, enter any other information in the Custom Fields that you have defined. See Custom Fields.

 

npw 10.png

 

When finished entering your Project information, click the [Save] button. The Project file will automatically open in the Project Editor interface.