Phases

 

SI 2017 Page Logo.jpg

Setting

 

Here you can add/edit/delete Phases.

 

File:SIX_Guide/005_Setup/002_Control_Panel/002_Catalog/003_Phases/phases_button.jpg

 

The Manage Phases form lists all of the Phases you have in your Catalog.

 

manage_phases_form.png

 

 

Phases allow you to identify the Phase of the project that Items are assigned to within a project, as well as charge for labor within a project on a per/product basis.

 

See Labor Considerations for your options for charging for labor in SI 2017 Projects and Service Orders.

Details

 

Manage/Arrange

 

manage and arrange buttons.png

 

You can add new Phases or edit existing ones.

 

You can delete Phases here. When you delete a Phase, Items in your Catalog assigned to this Phase will be designated "Unassigned".

 

If you edit a Phase name, all products in your Catalog assigned this Phase will be updated with the new Phase name.

You can order your Phases using the Move Up/Down buttons.

Fields

 

manage phases form.png

 

Each Phase is broken down into four sections: Base Labor, Misc. Labor, Mgt. Labor and Design Labor. The Misc. Labor, Mgt. Labor, and Design Labor are considered Subphases. There are eight columns: Cost/Hr, Price/Hr, Margin (%), Factor (%), Difficulty (%), Time Multiplier (%), Factored Cost/Hr, and Factored Price/Hr.

 

Field

Description

Cost/Hr:

How much labor costs you per hour

Price/Hr:

How much you charge per hour of labor

Margin (%):

The margin between Cost/Hr and Price/Hr

Factor (%):

What percentage of each Base Labor hour you are charging the client.  This number is always 100% for the Base Labor but you will most likely vary the Misc., Mgt., and Design percentages.  This will affect the number of hours used in calculations.  For example a Design Labor factor of 25% would mean that you would include .25 hrs (15 minutes) of Design Labor for each hour of Base Labor (Install Labor).

Difficulty (%)

This field is a multiplier for hours and it affects the Base and Misc. hours only. This number should be set to 100% by default but can be changed on a per project basis if you wish to increase the number of hours charged for Base and Misc. Labor.  For example, if you change this number to 200% for the Rough-In Phase within a project, all products assigned to the Rough-In Phase would will double the existing hours.

Time Multiplier (%)

These numbers show the details of what is being multiplied. 

Factored Cost/Hr:

Displays your Cost/Hr based on the number you enter for the Factor(%)

Factored Price/Hr:

This field cannot be edited.  It is your Price/Hr based on the number you enter for the Factor(%)


Ignore Labor Calculations

 

This option to have no labor calculations compute for a particular Phase.  You might use this option within a Project, for example, where you were not charging labor and only want to charge a client for the equipment within a particular Phase.

 

Phase Specific Adjustments

 

File:SIX_Guide/005_Setup/002_Control_Panel/002_Catalog/003_Phases/phase_specific_adjustments.jpg

 

This section for each allows you to set a Product Adjustment %, Misc Parts Adjustment %, and/or a Labor Adjustment % on a per Phase basis. When you check the Override Project Defaults for this Phase box, these values will override the Product Adjustment %, Misc Parts Adjustment %, and Labor Adjustment % settings under Price Adjustments Settings. Using these price adjustment settings on a per Phase basis gives you more control and accuracy than if you charge a percentage all products in a project.

Within the Project Editor

 

There are additional functions on the Manage Phases form within the Project Editor. To open this form, click the Settings tab then the Phases button:

 

phase button on ribbon in project editor.png

 

manage project phases form.png

 

Within a Project, you can adjust your Phases specifically for that Project. However, if you want the changes you make within a Project to be saved to your Catalog for all future Projects, you can. The [Save as Default] button will save the currently selected Phase to the Catalog while the [Save All as Default] button will save all Phases. The opposite of this is the [Restore Default] and [Restore All Defaults] buttons. These buttons will populate the Phase settings within the Project with whatever is in the Catalog.

 

These functions are most commonly used by new users who create their first Project before setting up their Phases and then want the changes they make in the Control Panel to apply to their existing Project(s).

The [Add Phases] button can be used if you created a Project and then created new Phases in your Catalog via the Control Panel.

 

When you click this button, a form will open showing you the Phases that are not already in the Project. You can select the ones you want then click the [Add] button:

 

add phases.png